Measure a continuous trench footing for walls and get concrete plus continuous rebar runs.
How it works
Length × width × thickness with 10% added, since trench sides are never straight. Bars are total runs in 20 foot lengths with 5% extra.
Before you order
- Footing width and depth come from your plans and soil, so treat this as the quantity step.
- Keep the bottom of the trench undisturbed and clean before the pour.
- Set steel on supports to hold cover from the soil.
Common questions
How deep should a footing be?
It must reach below your local frost depth. Your building department publishes that number.
Can I pour a footing without forms?
Yes, when clean trench sides will hold, but the volume can grow fast. Measure actual width after digging.